    Due to the Earthquakes of February 6, 2023, Construction Work for Repairation of All Damages Between TAG Motorway Aslanlı Tunnel (KM: 214+490) and Nurdağı Junction (KM: 223+115), and Seismic Strengthening of Viaducts in This Section.

    PROJECT INFORMATION:

    PROJECT APPLICATION TECHNIQUE: Strengthening of Foundation (Micropiles), Reinforced Concrete Jacketing for Pier Foundations, Steel Jacketing for Piers, The application of Fiber-Reinforced Polymer (FRP), Dynamic Upgrading with Seismic Devices (Dampers, Seismic Bearings, Seismic Expansion Joints), Slope Stability with Bored Piles and Reinforced Concrete Structures, Strengthening of Soil with Plastic Bored Piles, Cold Mixture Agregate Base Courses, Bitumunuous Hot Mixtures, Guss Asphalt

    PROJECT LOCATION: Nurdağı / Gaziantep

    DATE OF COMMENCEMENT: 04.05.2023

    DATE OF COMPLETION: Ongoing.